Skip to main content

I owe 13

I don't know if I've mentioned them before, but I have a set of rules I've invented for myself to keep myself on track. Some are way too stupid for words, like I've never missed a karate class if I've been in town for it on a Thursday evening or a Saturday afternoon.

Others are about knitting.

  1. I must knit two balls of yarn per week.
    I think this rule might have originated because once I said I could knit a ball a week to a yarn store employee (at Romni Wools), and she said "surely you can knit two." So I've been obligated to knit more ever since.
  2. A completed project (finishing) counts as a ball.
  3. A swatch counts as a ball, if I'm happy with the product. This is a good thing, as it coerces me to swatch.
  4. In a project knit from a cone, a front, a back or a sleeve counts as two balls. So the most a project knit from a cone can be worth is nine balls. A shawl also counts as nine balls, if it's knit from a cone or a giant ball.
  5. I can choose at the outset how I wish to count it.
  6. Every time I finish a project, I can buy a new ball of yarn.
    This rule has been stretched over the last year or so to include cones, which means that my stash has increased.
  7. Every time I finish two projects, I can buy a new project. I am often in arrears. Currently, I am at -3, which means that I need to finish five projects before I can buy one.
  8. A submission package sent to a magazine or yarn company counts as a project.

Currently I'm working on my IK Summer '06 submission package. I have one project to complete that will be part of the package, I finished two already and I did two swatches for those, and have another garment to go. To be honest, I probably will not finish the fourth garment, but will just do a swatch and hope they love it (I don't expect IK to accept more than one garment... but if they did that would be cool, since the projects each have taken me about 11 days average so far).

So how did I end up owing 14? I have no idea. But, if I finish the front of the IK garment (its name is Artemis) by tomorrow, it counts as two balls and I'm down to twelve. And if I finish the whole thing next week (it's a tank knit from a cone of Silk City Spaghetti) I'm down to 11. If I finish the swatch as well, I'm down to 1o. If I swatch the last project, Aphrodite, I'm down to 9. If I run out of yarn... Well, I'm screwed.

Popular posts from this blog

Best TW feedback ever

Over at the dayjob, SMEs are feverishly trying to get documents back to me all marked up, in preparation for the release that's supposed to happen the week I'm back from VP. Today's best comment: Unfortunately not true. SMEs, they're so cute.

What I read: August 2023

"The Absolute Book" by Elizabeth Knox. I got it for Christmas. It was delightful, even if maybe some stuff wasn't explained completely. Or maybe that's part of why it was delightful.  "Crucial conversations" By Joseph Grenny and three other old white men. Another office book club selection. The word "candor" comes up a lot. I really resented this book.  LHC #220: "The Goldfinch" by Donna Tartt. There was a girl at my previous company who wanted to have an office book club, and she had this book on her desk for months and months. I can totally understand this. I found portions crazy stressful to read. Like, I would be skipping ahead to see how much more in the section, could I get through it, pacing around, etc. I wanted to know how it ended, sure, but I was having weird stress dreams and stuff. If it wasn't a library book I might not have finished it at all. It was such a relief when Boris showed up again and something happened. I di

In Progress -- July 2023

  Wind/Water/Salt  Chapters 39-51:   Still n eed to take up comments and revise.  Persephone  (probably not its real name): Nothing but thoughts.  Short Stories:  As I mentioned last month I had a dish-washing epiphany on a story that wasn't going well. I'd already changed the POV character, but I knew that wasn't enough because I had no ending. It has an ending now.  Critted  4  Got back  0    I really need to post something new. Submissions  0  Out there   0   Rejects   1 Knitting Tay Tartan cardigan  (Martin Storey). Finally finished the danglers and minor seaming and chose buttons, then had to wait to block because the space I normally block in needed to be cleared, and this would be very disruptive to my work, so I waited to block it for the night before I went on vacation. It would appear that the finishing of this sweater took 4 months, which may be a new record. It fits for the most part. Yay!  Cathar  (self). Started the month just about done with the body edging.